ProcessCallbackDelegate: Xrm.ProcessFlow.ProcessCallbackDelegate

Called when process change methods have completed.

Param

The result of the process change operation.

Remarks

Values returned are:

  • success (The operation succeeded.)
  • crossEntity (The previous stage is for a different entity.)
  • beginning (The active stage is the first stage of the active path.)
  • invalid (The operation failed because the selected stage isn’t the same as the active stage.)
  • unreachable (The stage exists on a different path.)

Deprecated

Use ProcessCallbackDelegate instead.

Generated using TypeDoc